Skip to main content

Duma

No. 1 Most Applied WPC in Indonesia, Since 2003

No. 1 Most Applied WPC in Indonesia, Since 2003

DUMA® COH

5 Installation Tips for a Stronger, Longer-Lasting Ceiling

Incorrect Installation

Duma-COH_Cara-Pemasangan-Salah Duma-COH_Cara-Pemasangan-Salah-2 Duma-COH_Cara-Pemasangan-Salah-3

Correct Installation

Duma-COH_Cara-Pemasangan-Benar Duma-COH_Cara-Pemasangan-Benar-2 Duma-COH_Cara-Pemasangan-Benar-3

1. Use Click PVC

For areas exposed to direct sunlight, use Click PVC in accordance with DUMA®’s recommended installation system.

Do not use Tracker, as it may compromise installation stability.

 
Comparison of Tracker (not recommended) and Click PVC (recommended).
Lampiran-COH-1A

Click PVC system during installation.

Lampiran-COH-1B

2. Maintain Proper Batten Spacing

Follow the recommended batten spacing:

✔ 30 cm for areas exposed to direct sunlight. ✔ 40 cm for areas not exposed to direct sunlight.

Proper spacing helps minimize the risk of sagging.

 
Measuring batten spacing using a tape measure.
Lampiran-COH-2A
Illustration of 30 cm and 40 cm batten spacing.
Lampiran-COH-2B

3. Apply Sealant Evenly

Apply sealant or adhesive evenly to the Click PVC system before installing DUMA® COH.

 
Sealant application process.
Lampiran-COH-3A

Proper adhesion helps maintain installation strength and stability over the long term.

 
Comparison of even and uneven sealant application.
Lampiran-COH-3B

4. Ensure Profile Joints Are Positioned Above the Battens

When joining two profiles:

✔ Ensure both profile ends meet directly above a batten. ✔ Secure the Click PVC on both sides of the joint using screws.  

This method helps keep the joints strong and stable.

 
Correct joint positioning.
Lampiran-COH-4A
Profile joint positioned above the batten.
Lampiran-COH-4B

5. Do Not Suspend Loads from DUMA® COH

DUMA® COH is not designed to support suspended loads.

 
COH_Lampiran-5-A-Salah.jpg COH_Lampiran-5-A-Benar
Incorrect Installation Correct Installation

Lights, decorations, and other accessories must be attached to the main structural framework, not directly to DUMA® COH profiles.

 
 

Proper Installation for Long-Lasting Performance

Proper installation helps keep your ceiling neat, strong, stable, and durable over time.

IFGF-1

Entrust the installation to an Official DUMA® Installer who has been trained in accordance with DUMA® installation standards.

Lampiran-COH-Aplikator-Duma-2
Find an Official DUMA® Installer here!